NEC Technical Systems Limited delivers corrosion control and engineering services to Nigeria's oil and gas industry. Established in 1998.

Get in touch!

Discuss your engineering, construction, or maintenance requirements with our team.

KM 2 Eleme-Onne Road, by Anglican Church of the Holy Spirit Road, Elelenwo, Port Harcourt, Rivers State, Nigeria.

Projects

Explore selected work below, or search the full published register by project scope, location or client.

06Selected projects
38Documented records
01 / Selected work

Projects, in focus.

Published project information, with images from the original project pages.

02 / Project register

The wider body of work.

38 entries reproduced from the company’s published project register, with client names and completion status.

Ref.Project / scopeClient / contracting partiesStatus
1Rural Electrification of Abam-Abiala Nkamiri Obingwa LGA, Abia StateRural Electrification AgencyCompleted
2Provision of 500KVA Transformers in Okpo, Ejenim, Ach (Olamaboro LGA); Bagana, Ola; Ichala, Idoma (Idah LGA); Gharia, Mozu (Bassa LGA); Abocho, Osane-Enugu (Dekina LGA), Kogi East Senatorial DistrictVee Tek Nigeria LimitedCompleted
3Riser Connection to Hot Tap Valve on Indorama 18" GaslineIndorama / EPCLCompleted
4Support Services on Hot Tap Activities for Indorama/Shell LinesHYOTEM / Indorama EPCLCompleted
5Tie-In of 16" x 12" Barred Tee to SPDC 16" Gasline at RumukwurushiBaywood / Indorama / EPCL / SPDCCompleted
6Brass Tank Replacement ProjectNAOCCompleted
7Detection and Repair of Gas Leak at OB/OB Gas PlantNAOCCompleted
8Integrity Analysis and Maintenance of Gas Line at Aba PlantSeven-Up Bottling Company PlcCompleted
9Construction of Olom-A0 (Olom-41) Flowline in OML 30NPDCCompleted
10Construction of Ogini Y & Z Flowlines in OML 26NPDCCompleted
11Construction of Oredo "M" Single FlowlineNPDCCompleted
12Construction of Oredo 12S and I FlowlinesNPDCCompleted
13Dredging, Welding and Laying of 10 Flowlines Across Orashi RiverNAOCCompleted
14Urgent Repair of 2 Vandalized Portions on Oziengbe-South Crude Oil Export PipelineNPDCCompleted
15Urgent and Permanent Repair of 2 Vandalized Portions of Oredo Export Pipeline at Ologbo River (KM17)NPDCCompleted
16Repair of 2 Vandalized Portions of Oredo Export Pipeline at KM16 Valve House - Oredo ROWNPDCCompleted
17Urgent Repair of 1 Ruptured Well 2S Flowline near Oredo Flow StationNPDCCompleted
18Repair of 3 Vandalized Portions of Oredo and Oziengbe-South Crude Oil Export PipelineNPDCCompleted
19Pipeline Emergency Repairs at Entire Mosimi AreaPPMCCompleted
20Rehabilitation of 24" Escravos-Warri Crude Pipeline SystemPPMC / NNPCCompleted
21Oshie 8SS 2.5Km Flowline Sectional ReplacementNAOCCompleted
22Laying of 10 Orashi River Crossing Flowlines OB/OBNAOCCompleted
23Kwale/Okpai Field Flowline LiftingNAOCCompleted
24Inim Condensate Pump Installation and Piping ModificationMobilCompleted
25Underwater Repair of Ruptured Point Along PPMC Pipeline at Ijegun, Lagos (Spider Wrap Composite Epoxy)NNPC / PPMCCompleted
26Provision of Coded Welding Maintenance Services at QIT, BRT and Mobil Offshore LocationsMobilCompleted
27Flowline/Wellhead Loop Maintenance and Platform Fabrication in Agip Land AreaNAOCCompleted
28Inspection (Ultrasonic Thickness Measurement) of Pressure Vessels in Oshie Flow StationNAOCCompleted
29KC Loading Offshore Platform Accommodation ModificationHORCHI / SPDCCompleted
30Scrapped Flowlines Recovery for Umoru 5-T (Land Area)NAOCCompleted
31Scrapped Obiafu Flowlines Recovery (Land Area)NAOCCompleted
32Scrapped Ebegoro Flowlines Recovery (Land Area)NAOCCompleted
33Repair of 18" Schedule 80 Ruptured Pipeline Between Okrika Jetty and Refinery (Sectional Replacement)PPMC / NNPCCompleted
34Flowline Laying of Okpai-12 Location (8Km)NAOCCompleted
35Flowline Laying of Kwale 17 (8Km)NAOCCompleted
36Non-Destructive Testing on 6" Pipeline at UbahuPPMC / NNPCCompleted
37Flowline Laying of Beniku 1st (Dual String of 28Km)NAOCCompleted
38Scrapped Flowlines Recovery (Land Area)NAOCCompleted
Your next project

Let’s talk about the work ahead.

Share your scope, location and technical requirements with our team.

Discuss your project →